Highway Engineering Mcqs, this topic has 129 mcqs, It takes five to ten minutes to complete this free Highway Engineering Mcqs test. You will see 4 or 5 option of each question. You must choose / think only one option and then press on answer key for check right answer. Practice "Highway Engineering Mcqs" MCQs and share with your friends, brothers, sisters.
Highway Engineering Mcqs (Total Quiz: 129)
MCQ: The shape of the camber, best suited for cement concrete pavements, is_______________?
- straight line
- parabolic
- elliptical
- combination of straight and parabolic
A
MCQ: The stopping sight distance depends upon_______________?
- total reaction time of driver
- speed of vehicle
- efficiency of brakes
- all of the above
D
MCQ: Coefficient of friction is less when the pavement surface is________________?
- rough
- dry
- smooth and dry
- smooth and wet
D
MCQ: Camber in the road is provided for_______________?
- effective drainage
- counteracting the centrifugal force
- having proper sight distance
- none of the above
A
MCQ: On a single lane road with two way traffic, the minimum stopping sight distance is equal to______________?
- stopping distance
- two times the stopping distance
- half the stopping distance
- three times the stopping distance
B
MCQ: The shoulder provided along the road edge should be_______________?
- rougher than the traffic lanes
- smoother than the traffic lanes
- of same colour as that of the pavement
- of very low load bearing capacity
A
MCQ: When the path travelled along the road surface is more than the circumferential movement of the wheels due to rotation, then it results in______________?
- slipping
- skidding
- turning
- revolving
B
MCQ: For water bound macadam roads in localities of heavy rainfall, the recommended value of camber is_______________?
- 1 in 30
- 1 in 36
- 1 in 48
- 1 in 60
B
MCQ: The sequence of four stages of survey in a highway alignment is______________?
- reconnaissance, map study, preliminary survey and detailed survey
- map study, preliminary survey, reconnaissance and detailed survey
- map study, reconnaissance, preliminary survey and detailed survey
- preliminary survey, map study, reconnaissance and detailed survey
C
MCQ: Nagpur road plan formula were prepared by assuming______________?
- rectangular or block road pattern
- radial or star and block road pattern
- radial or star and circular road pattern
- radial or star and grid road pattern
D